Construction
Machine control

While the productivity of construction sites used to depend largely on a bunch of precisely placed surveyor’s stakes and the right heavy-duty equipment operators, the advent of 3D model machine control is quickly defining a new era of construction site efficiency. And our team at Take-Off Professionals is here to support all of your GPS machine control modeling needs.
- Increases heavy duty machine efficiency.
- Decreases operating expenses
- Lowers surveying costs
- Reduces raw materials costs
- Reduces labor costs
As Built Plans

Diolkos3d’s team of professional surveyors can customize the As-Built survey to suit clients’ needs. An As-built survey may depict only the level of detail the client requires for a specific phase of the project. Alternatively, the client may request a higher level of detail with elevations and contours, street cross sections, and detailed sketches of sewer and storm drain depths and pipe sizes.
- Road as built plans
- Road as built cross-sections
- Road as built Profiles
- Utilities as built drawings
Work zone traffic control

The Diolkos3d traffic design team creates signing, striping, and pavement marking plans for work zones. Signing and pavement markings are important components to create the separation of traffic flows in separate or opposite directions, to mark the edge of workzones, and travel lanes, and to encourage or discourage crossings, among other uses.
- Work zone trafic signing
- Temporary pavement Marking Plans
- Portable Traffic Signal dimensioning
- informative signs dimensioning
